Your Feedback

Renewable energy


Select one or more options in each of the three sections (industry sector, publication time, year of publication) below and click on the “Search icon.
To search by keywords, enter them in the line "Search keyword", check the box "Search in words" and again click on the “Search icon”. You can also use the list of the most common words and phrases - just click on one of them. When typing multiple keywords, use AND with spaces on both sides. To cancel all options, click “Cancel filter”. To access the library’s archive featuring sources covering the past five years, please register.

Industry Sector
Publication Type
Publication Year
For registered users.
Please log in or register, to see information.
Combined search

Using a combination of double words in the search by keyword (word1 AND word2). If you select 'search words' combination will not be taken into account, they will be selected only full match phrases

Found items: 49
Display results per page:
Article (R) Mountain forest wood fuel supply chains: comparative studies between Norway and Italy /Clara Valente, Raffaele Spinelli, Bengt Gunnar Hillring, Birger Solberg/Biomass and Bioenergy, Volume 71, Pages 370-380/December, 2014/11 p./ United Kingdom
Details: OtherAndUnspecifiedTechnologies, Pre-TreatmentOfFeedstock, HighOpex/RepairAndReplacement, HighCostsInGeneral
Newsletter, Press Releases (B) NREL Analyzes Floating Offshore Wind Technology for Statoil / 6 Nov 2014 / News and Feature Stories / News /  National Renewable Energy Laboratory United Kingdom
Details: Wind, Offshore, Research, Norway
Article (R) Effects of the Torrefaction Conditions on the Fixed-Bed Pyrolysis of Norway Spruce /C. Branca, C. Di Blasi, A. Galgano, M. Broström/Energy Fuels, Volume 28, Issue 9, Pages 5882–5891/August 24, 2014/10 p./ United Kingdom
Details: Pyrolysis&Torrefaction, Pre-TreatmentOfFeedstock, LowEfficiency/VarietyOfFeedstock
Patent (B) CONTROL SYSTEM FOR A WIND TURBINE / Appl. WO2011023637A2 / IPC: F03D7/02; F03D9/00; G01R31/36; H02J9/06 / BJORK Mikael; AXELSSON Ulf / GE WIND ENERGY (NORWAY) AS (NO); BJORK Mikael (SE); AXELSSON Ulf (SE) / Appl. Date: 20.08.2010 / Publ. Date: 03.03.2011 / United Kingdom
Details: WindTurbineTypeUnspecified, Method, ControlAndSafetySystems, LowEfficiencyCausedByWindVariability